Preconstruction & Design-Assist

Preconstruction Services That Prioritize and Price Your Repairs First

Know what to fix first, and what it costs, before you commit to engineering

Shepperd Construction assesses the conditions, ranks the critical repairs, and hands your board a phased, budget-ready plan. Our preconstruction services let cost guide the decision, so you fund the right work in the right order. We serve HOAs, condo communities, commercial buildings, and institutions across Austin, San Antonio, Dallas, and Fort Worth.

Get Your Preconstruction Assessment

Start With the Numbers

Let Cost Drive the Decision, Not the Other Way Around

Most boards approach a major repair backwards. They hire an engineer, wait months for a design, then learn the price after the plans are drawn. Preconstruction services flip that order. Shepperd assesses the property first, prices the repair options, and lets your board decide with real costs in front of you. The pricing sets the priorities, and every decision that follows has a number behind it.

Priorities Before Price Tags

We identify which repairs are urgent, which can wait, and what each one costs, so the board never guesses at what to tackle first.

Fund the Right Work First

A phased breakdown lets you spread a major repair across budget cycles instead of draining reserves on a single, rushed decision.

Skip Unnecessary Engineering Spend

Depending on scope, preconstruction services can reduce or remove the need for a separate upfront engineering assessment, which keeps early costs down.

What It Covers

What Preconstruction Services and Design-Assist Actually Mean

Preconstruction services are the assessment, estimating, and planning work that happen before construction starts. Shepperd inspects the existing conditions, reviews your documents, identifies the critical repair items, and ranks them by priority. From that discovery, we build recommended repair quantities and estimate options, so you see the most cost-efficient repairs and replacements side by side. Design-assist runs alongside it: we shape the scope around what the budget and the building actually need, working with your engineer when one is retained. If you are still deciding whether the damage calls for a rebuild, start with our guide on how to know if water damage requires reconstruction, then bring us in to price the path forward.

Construction crew inspecting overhead piping and structural elements in a basement area.

Estimates Written by the Team That Builds the Work

The value of a preconstruction estimate depends entirely on whether it survives contact with the actual job. Shepperd has spent 12 years reconstructing roofs, envelopes, and full buildings across Texas, so we price repairs the way we build them. The numbers your board approves during preconstruction services hold up when crews are on site, because the same team that estimates the work stands behind it. That is the difference between a plan a board can fund with confidence and a spreadsheet that unravels at the first change order.

Built for HOAs, Buildings, and Institutions Across Texas

Preconstruction services apply anywhere a repair is large enough that the sequence and the cost need to be planned, not guessed. The process scales from a single condo building to a multi-building portfolio. If your property has active water intrusion right now, our page on water leaking through a roof into a condo unit covers the immediate problem, and preconstruction handles the plan to fix it for good.

Worker operating telescopic forklift near multi-story building wrapped in scaffolding.

HOAs & Condo Communities

Plan roof and envelope repairs across multiple buildings without draining reserves in one year. See our work as a reconstruction contractor for HOAs and condo communities.

Street view of building covered in scaffolding and safety mesh during renovation.

Commercial Buildings

Phase commercial building reconstruction around tenants and daily operations, with pricing that supports a capital plan.

Multiple large white tower cranes operate over a massive steel and concrete building structure at a busy urban construction site under a blue sky.

Senior Living, Schools & Municipalities

For senior living centers, school districts, and city budgets, we produce the line-by-line justification these decisions require.

How the Preconstruction Process Runs

Preconstruction services follow a clear sequence, and you see progress at every stage rather than waiting months for a single deliverable. Each phase produces something your board can use, not a status update.

Preconstruction Services sheppered construction (5)
Phase 1
Kickoff, Walkthrough & Conditions Inventory

We start with a planning meeting, then inspect the roof, flashing, and building envelope and document the existing conditions. This discovery becomes the factual base for everything that follows, with no assumptions, just what the property is telling us.

Preconstruction Services sheppered construction (3)
Phase 2
Budgetary Pricing & Prioritization

We turn the conditions inventory into recommended repair quantities and budgetary pricing, then rank every item by priority, so urgent and deferrable work are easy to tell apart before any money is committed.

Preconstruction Services sheppered construction (2)
Phase 3
Final Pricing, Phasing & Permitting

Once scope and materials are set, we deliver a construction schedule, a phasing plan sequenced for financial efficiency, permitting coordination, and a site utilization plan that shows residents what to expect while work is underway.

Preconstruction Services sheppered construction (1)
Phase 4
RFP Solicitation & Handoff

When you want competitive bids, we issue an RFP to other contractors on your behalf, so your final pricing reflects a real market on a fixed scope, then we hand your board a plan it can execute.

Construction crew inspecting overhead piping and structural elements in a basement area.

Why Shepperd

Why Boards Bring In Shepperd First

Boards choose preconstruction services with Shepperd because the estimate is honest, the pricing is accurate, and the scope is clear from day one. We tell you what the assessment covers, what it does not, and when a project genuinely needs a licensed engineer.

What the Engagement Includes, and Where an Engineer Comes In

Inspection & Conditions Review

A full walkthrough of the roof, flashing, and envelope, plus document review to establish exactly what needs repair and where it sits.

Estimating & Prioritization

Recommended repair quantities, budgetary and final pricing, and a priority ranking that drives the phasing and the budget.

Scheduling, Phasing & Permitting

A construction schedule on the critical path, a financially efficient phasing plan, permitting coordination, and RFP solicitation, all inside one preconstruction services engagement.

What Needs a Licensed Engineer

Third-party testing, geotechnical or structural engineering, destructive testing, and construction drawings sit outside preconstruction services. When your scope requires them, we say so and can refer an engineer your board contracts directly.

The Board-Ready Plan You Walk Away With

At the end of the assessment, your board receives a plan it can act on and fund. Preconstruction services turn a vague sense that something is failing into a prioritized, costed, sequenced decision the whole board can stand behind, and take to a reserve study, a special assessment vote, or a lender without having to explain away gaps.

Prioritized Repair Breakdown

Every critical item ranked by urgency, with pricing attached, so the most important work is obvious and defensible to owners.

Financially Efficient Phasing

A chronology that sequences the work around your budget, with a construction schedule mapped to the critical path.

Competitive RFP On Your Behalf

When you want to test the market, we generate and distribute an RFP to other contractors on a scope that is already defined.

Frequently Asked Questions

Cost depends on the size of the property and the scope of the assessment, so pricing is set per project once we understand what you are dealing with. What stays consistent is the value of the deliverable: your board receives a prioritized, costed repair plan before committing to a full engineering design, which often lowers the total spend on the project. Many boards find that pricing the repairs early prevents far more expensive surprises later, when a rushed decision locks in the wrong scope. Preconstruction services are priced to pay for themselves by protecting the far larger construction budget behind them. Tell us about your property and we will scope the assessment.

Sometimes, and sometimes not. Depending on the scope and your jurisdiction, preconstruction services can reduce or remove the need for a separate upfront engineering assessment, because the costing and prioritization work is done first. For many repair-focused projects, that is enough for a board to plan and fund the work. When a project does require licensed engineering or design, we identify that early and can refer an engineer, whom your board would contract directly. We stay clear about the line between what preconstruction covers and what needs an engineer, so you never pay for engineering you do not need, and you are never caught short on a project that genuinely requires it.

Timelines vary with the size and condition of the property, but the process is built so you see progress at each stage rather than waiting on one large deliverable. It moves from kickoff and walkthrough, to budgetary pricing and prioritization, to full pricing, phasing, and scheduling. Smaller single-building assessments move faster than multi-building HOA or commercial portfolios. Once we have walked the property, we give you a clear schedule with dates for each phase and the final budget. Most preconstruction services engagements deliver the prioritized estimate well before a full engineering cycle would even begin.

The engagement covers inspection and conditions review, document review, prioritization of critical repairs, recommended repair quantities, budgetary and final pricing, permitting coordination, construction scheduling, a phasing plan, a site utilization plan, and RFP solicitation on your behalf. It does not include third-party testing, geotechnical or structural engineering, destructive testing, or construction drawing production. Preconstruction services are the planning and costing layer that sits before the build, and we are direct about where that layer ends and licensed engineering begins.

We work with HOAs, condo communities, apartment complexes, commercial buildings, senior living centers, school districts, religious organizations, and city municipalities. Geographically, we serve properties throughout Texas, with reconstruction contractors across Austin, San Antonio, Dallas, and Fort Worth. Whether you manage one association or a portfolio of buildings, preconstruction services scale to the size of the decision in front of your board. If you are outside these metros but inside Texas, reach out and we will tell you how we can help.

They are two halves of the same job. Preconstruction is the assessment, estimating, and planning that produce a costed, prioritized repair plan. Design-assist is the collaborative work that shapes the scope around what the budget and the building actually need, alongside your engineer when one is retained. In practice you experience preconstruction services and design-assist as one engagement: we price the work, and we help shape the scope so the pricing stays honest and the plan stays buildable.

Yes. Once the scope is defined, preconstruction services include generating and distributing an RFP to other contractors on your board’s behalf. Because every bidder prices the same defined scope, you get a genuine market comparison instead of quotes built on different assumptions. That protects the board, gives owners confidence the pricing is fair, and makes the final selection easy to defend.

Your board holds a prioritized, costed, phased plan and, if you requested it, competitive bids on a defined scope. From there you decide the pace: fund and start the first phase, take the plan to a reserve study or assessment vote, or move straight into the construction agreement with us. The plan is built to be executed, so your preconstruction services investment carries straight into the build with nothing to redo.

Preconstruction & Design-Assist

Get Your Preconstruction Assessment

Tell us about the property and we will scope your assessment

Bring us in at the start, before the engineering bills and the guesswork. We will assess the conditions, rank the critical repairs, and give your board a phased, costed plan to work from. Reach out through our contact page to get started.

Get Your Preconstruction Assessment